5635 N Scottsdale Rd Suite #170, Scottsdale, AZ 85250Serving Scottsdale & nearby communities

What to Consider Before Starting a Whole-Home Renovation

A whole-home renovation is a series of decisions that build on each other. Getting the early ones right, like scope, priorities, approvals and where you will live, matters more than any finish you pick later.

Homeowner guideUpdated November 20269 min readBy the Scottsdale Elite Remodelers team
Open living room with leather chairs, a stone hearth and floor-to-ceiling windows
Design inspiration image.

1. Define what “whole home” means for you

Write down every room and system you want to change, then mark each as must-have, want or maybe. Whole-home projects tend to grow, and a ranked list makes trade-offs easier later.

2. Look behind the walls first

Finishes are the fun part, but systems come first. Before design is final, assess:

  • Electrical panel capacity and wiring age.
  • Supply and drain piping material and condition.
  • HVAC age and sizing, especially if walls or windows change.
  • Roof condition, since new skylights or vents tie into it.
  • Windows and insulation. Scottsdale summers make the building envelope a comfort issue.

3. Know your approvals

ApprovalWhen it applies
Building permitsMoving walls, adding plumbing or electrical, structural work. See our permit guide.
HOA architectural reviewExterior changes in planned communities. Sub-associations may review first.
Historic preservationHomes in Scottsdale’s historic districts. See the city program.
ESL overlayExterior and site work in much of northern Scottsdale. See ESL.
Other jurisdictionsParadise Valley, Fountain Hills, Cave Creek, Carefree and county areas use their own permit offices.

4. Decide whether to live there

If the kitchen and most bathrooms are under construction at the same time, living in the house is hard. Moving out usually shortens the job. Phasing lets you stay, but adds setup and time. Decide early, because it shapes the schedule.

5. Set the budget around priorities

  • Fund systems and structure first. They are expensive to revisit later.
  • Carry one finish palette through the house so rooms feel connected.
  • Choose where to splurge, such as the kitchen or primary bath, and where to keep it simple.
  • Keep a contingency for what demolition reveals.

6. Choose a delivery method

You can hire an architect and then bid the work to contractors, or use one design-build team for both. Both work. Design-build gives cost feedback during design. Separate design gives you an independent design voice and competitive bids.

7. Make selections before demolition

Ordering cabinets, windows, tile and fixtures before work starts avoids a stalled site. Late changes are one of the most common causes of delays.

8. Plan for the desert climate

Use the renovation to improve shade, insulation and windows, and choose finishes that handle sun and dust. See choosing materials for an Arizona renovation.

When you are ready to talk scope, see whole home remodeling or start smaller with multi-room remodeling.

Questions

Frequently asked questions

How far ahead should I start planning?

Earlier than you think. Design, selections, permits and HOA reviews often take longer than construction prep. Starting several months ahead is common for large projects.

Should we renovate before moving in?

If you are buying a home that needs major work, renovating before moving in avoids living through construction and lets crews work faster.

Request an estimate

Ready to Plan Your Scottsdale Home Renovation?

Tell us about your remodeling plans and the spaces you want to transform.

Prefer to talk it through?
(480) 771-7115

Please enter your name.

Please enter a 10-digit phone number.

Please enter a valid email address.

Please add a short description (at least 10 characters).

Fields marked * are required. We use your details only to respond to this request. See our privacy policy.

Call NowRequest an Estimate